Construction Estimating Services
Built for US Projects
From early-phase feasibility budgets to full bid-ready takeoffs — every deliverable is CSI-formatted, RS Means benchmarked, and delivered on your deadline.
✓ 98% Bid Accuracy
✓ 24-48 Hr Delivery
✓ RSMeans Benchmarked
✓ CSI MasterFormat
✓ NDA Available
✓ 5★ Fiverr Rated
Services
Everything from Takeoff to Bid Package
📐
Quantity Takeoff
Precise material counts from any drawing format — PDF, DWG, Revit. Covering structural, architectural, MEP, and finishes. Output: Excel BOQ with CSI division breakdown and measurement backup sheets.
Formate
PDF · DWG · RVT · XLS
Delivery
24–48 Hours
Output
Excel + PDF BOQ
💰
Bid Proposal Preparation
Complete RFP-ready bid packages: cover letter, scope clarifications, unit-rate schedule, labor + material breakdown, exclusions list, and alternates. Reviewed against the RFP specifications before delivery.
Formate
PDF RFP · Drawings
Delivery
48-72 Hours
Output
Word + Excel Package
🏗️
Pre-Construction Cost Budgeting
Progressive cost estimates from conceptual (±20%) through design development (±10%) benchmarked to RS Means city cost indices. Includes system-level breakdown, contingency recommendation, and value-engineering options.
Phases
SD · DD · CD · GMP
data source
RS Means + Local
Output
Excel Budget Report
📅
Project Scheduling (CPM)
Baseline CPM schedules, look-ahead programmes, and recovery schedules for construction projects of all scales. Linked to BOQ activities with resource loading. Output in MS Project, Primavera P6, or PDF Gantt.
Tools
MS Project · P6
Delivery
48-96 Hours
Output
.MPP · .XER · PDF
How it Works
4 Step Process - Start to Delivery
① Upload Drawings
PDF, DWG, Revit accepted
② Get Quote (2 hrs)
Fixed-price scope confirmation
③ We Estimate
Using RS Means & local data
③ We Estimate
24–48 hrs, Excel + PDF
Case studies
Featured Projects & Case Studies
Not sure which service you need?
Upload your drawings and tell us your deadline — we’ll recommend the right service and scope it for free.
Latest Articles

Why Small Contractors Run Out of Cash Even When Projects Are Profitable: A Quantity Surveyor’s Hard-Earned Insights
I’ve been working as a quantity surveyor and contract manager for over three years now,

Why Construction Projects End in Disputes | Understanding the Client–Consultant–Contractor System
Construction projects often start with clear goals and enthusiasm, but many end in conflict. Even

What Does a Quantity Surveyor Actually Do? (From Tender to Final Account)
Introduction Whenever I tell someone that I’m a quantity surveyor, the reaction is usually the
About Me
Experienced QS & Contract Engineer
Helping you navigate the Realities of construction cost estimation.
Services Offered
BOQ Preparation & Review
Rate Analysis & Cost Advice
Tender & Claims Consulting
Project Estimation Support
Get In Touch
Have a question or need Advice?